SUNRUI Blade SR 220 Blade Mass Production Delivery
Release time:
2022-06-17
On June 15, the first set of SR220 wind turbine blades with a length of 107 meters was successfully shipped in Jiangsu Sheyang Port. The SR220 blade independently developed by SUNRUI Blade is one of the star products that the same as the first 100-meter-class SR210 blade launched by the company in February 2021.
In the process of developing SR220 blade at Jiangsu Yancheng Base, faced with a series of unfavorable factors such as port closure, transportation interruption, and mold delivery time lag caused by the sudden epidemic, the members of the project team worked together to overcome the difficulties and went all out to fight for more than 30 consecutive days, which ensures the successful trial production of SR220 blade and the delivery of the first set on schedule. On the basis of mass production of SR210 blade, the company will mass-produce the SR220 series products.
The successful delivery of the blades benefited from SUNRUI Blade’s leading offshore blade design and development capabilities and SUNRUI blade mature agile development system, which fully guaranteed the reliability of blade development. During the development of SR220 blade, relying on blade aerodynamics, structure, process and support, and the coordination of production teams, the members used risk management tools such as FMEA to identify development risks and make various plans in advance. In terms of process development, following the principle of “decisive battle at the start”, the development team relies on the leading second-generation pultrusion beam infusion technology, accurate laying design of hyperboloid materials, mold clamping gap control, complex structure heat transfer and rapid curing technology, only half a month, then successfully completed the first set of SR220 blade product manufacturing, which raising the original large blade development efficiency level to a new height.
In recent years, SUNRUI Blade has successfully developed a variety of offshore blades with the industry-leading R&D and production capacity, and the comprehensive strength is leading in China. In the future, SUNRUI Blade will adhere to the strategic guidance of “innovation and leadership, develop both land and sea, and strengthen to the sea”, continue to cultivate wind power new energy business, enhance the core competitiveness of wind power, and do the best to the achievement of “dual-carbon goal” and high-quality development with advanced technology R&D and lean manufacturing capabilities.
Related News
On August 22, the first onshore SR112 blade jointly developed by Sunrui Blade, Times New Materials and CRRC Zhuzhou Institute successfully rolled off the assembly line, adding a new member to the company’s onshore 100-meter ultra-large blade profile.
2024-08-24
Luoyang SUNRUI Wind Turbine Blade Co., Ltd. (for short “SUNRUI Blade”) debuts at the conference with Three Carbon Fiber Winding Hydrogen Storage Cylinders, which attracted great attention from the guests.
2024-06-10
Recently, the Xinjiang Uygur Autonomous Region Federation of Trade Unions announced the results of the selection of Model Workers' Home in Autonomous Region in 2023, and the Trade Union Committee of Luoyang Sunrui Wind Turbine Blade Co., Ltd. Hami Branch won this honor.
2024-02-06
Good news| Jiangsu SUNRUI won the title of "Jiangsu 5G Factory"
Recently, Industry and Information Technology Department of Jiangsu released "2023 Jiangsu Province 5G Factory Project List Announcement", and Jiangsu SUNRUI is on the list.
2023-10-24
SUNRUI Blade is unveiled at the 2023 China Wind Power
On October 17-19, China Wind Power (CWP2023), the largest and influential event of wind power in the world, was held at China International Exhibition Center (Shunyi Pavilion) as scheduled.
2023-10-21
Recently, the Science and Technology Award Recognition Conference sponsored by the Chinese Materials Research Society was held in Shenzhen. With the support of 725, the project "Key Technology and Industrialization of Ultra-large Wind Turbine Blade Composite Material Design and Process" led by SUNRUI Wind Turbine Blade Corporation as the first completion unit won the first prize of Science and Technology Award of Chinese Materials Research Society.
2023-07-13